Site supervision: what the director of works actually controls – with measurable deliverables
Many renovations get stuck on details that look minor: an incorrect permit path, outdated drawings or a hidden constraint. In Sicily, coastal exposure and mixed building stock make early checks even more important.
Where to start
Commission an accurate measured survey and clear drawings: without reliable measures, design is guesswork.
Collect the key documents (permits, drawings, cadastre) and check consistency between existing condition and authorised state.
- How to keep changes under control
- Constraints to check early
- How to document decisions
Schedule and cost control
Set up a bill of quantities and specifications that describe works, materials and tolerances in measurable terms.
Build a realistic programme and the right sequence of trades.
- Documents you should have
- How to keep changes under control
- Constraints to check early
Permits and documentation
Prepare a complete technical report to reduce requests for clarifications and delays.
Choose the correct route (CILA, SCIA or permit) based on the scope and the building context.
- Constraints to check early
- Questions to ask contractors
- How to document decisions
- You need a quick technical check before buying or signing.
- You must confirm the right permit path and missing documents.
- You want measurable specs to compare quotes properly.
- You started works and need to regain control of scope and changes.
- Starting without a measured survey and without verifying the authorised state.
- Accepting vague quotations (generic items, undefined materials).
- Discovering constraints or approvals after works begin.
- Managing changes informally, without updated quantities and records.