Site supervision: what the director of works actually controls – with low-maintenance materials

If the project starts without solid technical ground, money goes into corrections instead of outcomes. Here is what to check early. In Sicily, coastal exposure and mixed building stock make early checks even more important.

Start hereWhatsApp

Technical details that matter

Verify material compatibility with substrates, especially near the coast where salt air accelerates decay.

Design for durability and maintenance: the best-looking solution is not useful if it does not last.

Permits and documentation

Prepare a complete technical report to reduce requests for clarifications and delays.

Check constraints and approvals (heritage, landscape, condominium) before appointing contractors.

Schedule and cost control

Set up a bill of quantities and specifications that describe works, materials and tolerances in measurable terms.

Track decisions on site: inspections, progress records and structured change management.

Contact Studio 4e if:
  • You need a quick technical check before buying or signing.
  • You must confirm the right permit path and missing documents.
  • You want measurable specs to compare quotes properly.
  • You started works and need to regain control of scope and changes.
Common mistakes to avoid
  • Mixing up cadastre updates and building permits (they are different).
  • Ignoring waterproofing, slopes, ventilation and other “small” details.
  • Applying standard solutions without reading the building context.
  • No clear responsibilities between client, contractor and designers.