Site supervision: what the director of works actually controls – for coastal villas

Many renovations get stuck on details that look minor: an incorrect permit path, outdated drawings or a hidden constraint. In Sicily, coastal exposure and mixed building stock make early checks even more important.

Start hereWhatsApp

Schedule and cost control

Set up a bill of quantities and specifications that describe works, materials and tolerances in measurable terms.

Track decisions on site: inspections, progress records and structured change management.

Permits and documentation

Choose the correct route (CILA, SCIA or permit) based on the scope and the building context.

Prepare a complete technical report to reduce requests for clarifications and delays.

Where to start

Collect the key documents (permits, drawings, cadastre) and check consistency between existing condition and authorised state.

Define priorities and constraints: what is mandatory, what is desirable and what can wait.

Contact Studio 4e if:
  • You need a quick technical check before buying or signing.
  • You must confirm the right permit path and missing documents.
  • You want measurable specs to compare quotes properly.
  • You started works and need to regain control of scope and changes.
Common mistakes to avoid
  • Mixing up cadastre updates and building permits (they are different).
  • Ignoring waterproofing, slopes, ventilation and other “small” details.
  • Applying standard solutions without reading the building context.
  • No clear responsibilities between client, contractor and designers.