Renovating bathrooms in Sicily: waterproofing details that matter – with low-maintenance materials
Before you start, align documents, scope and priorities. That alone prevents most late changes and cost overruns. In Sicily, coastal exposure and mixed building stock make early checks even more important.
Technical details that matter
Focus on critical junctions (waterproofing, thermal bridges, services) because most post-handover issues start there.
Design for durability and maintenance: the best-looking solution is not useful if it does not last.
- Questions to ask contractors
- How to keep changes under control
- Documents you should have
Where to start
Commission an accurate measured survey and clear drawings: without reliable measures, design is guesswork.
Collect the key documents (permits, drawings, cadastre) and check consistency between existing condition and authorised state.
- Constraints to check early
- How to document decisions
- How to keep changes under control
Schedule and cost control
Build a realistic programme and the right sequence of trades.
Track decisions on site: inspections, progress records and structured change management.
- How to document decisions
- Documents you should have
- Constraints to check early
- You need a quick technical check before buying or signing.
- You must confirm the right permit path and missing documents.
- You want measurable specs to compare quotes properly.
- You started works and need to regain control of scope and changes.
- Mixing up cadastre updates and building permits (they are different).
- Ignoring waterproofing, slopes, ventilation and other “small” details.
- Applying standard solutions without reading the building context.
- No clear responsibilities between client, contractor and designers.
If you want a clear starting point for a project in Sicily,Studio 4ecan review your context and outline the right technical steps.