Moisture and salt air: diagnosing damp issues near the coast – with measurable deliverables

Before you start, align documents, scope and priorities. That alone prevents most late changes and cost overruns. In Sicily, coastal exposure and mixed building stock make early checks even more important.

Start hereWhatsApp

Schedule and cost control

Track decisions on site: inspections, progress records and structured change management.

Build a realistic programme and the right sequence of trades.

Permits and documentation

Choose the correct route (CILA, SCIA or permit) based on the scope and the building context.

Check constraints and approvals (heritage, landscape, condominium) before appointing contractors.

Technical details that matter

Design for durability and maintenance: the best-looking solution is not useful if it does not last.

Focus on critical junctions (waterproofing, thermal bridges, services) because most post-handover issues start there.

Where to start

Define priorities and constraints: what is mandatory, what is desirable and what can wait.

Collect the key documents (permits, drawings, cadastre) and check consistency between existing condition and authorised state.

Contact Studio 4e if:
  • You need a quick technical check before buying or signing.
  • You must confirm the right permit path and missing documents.
  • You want measurable specs to compare quotes properly.
  • You started works and need to regain control of scope and changes.
Common mistakes to avoid
  • Starting without a measured survey and without verifying the authorised state.
  • Accepting vague quotations (generic items, undefined materials).
  • Discovering constraints or approvals after works begin.
  • Managing changes informally, without updated quantities and records.

If you want a clear starting point for a project in Sicily,Studio 4ecan review your context and outline the right technical steps.