Moisture and salt air: diagnosing damp issues near the coast – with low-maintenance materials

Many renovations get stuck on details that look minor: an incorrect permit path, outdated drawings or a hidden constraint. In Sicily, coastal exposure and mixed building stock make early checks even more important.

Start hereWhatsApp

Where to start

Define priorities and constraints: what is mandatory, what is desirable and what can wait.

Collect the key documents (permits, drawings, cadastre) and check consistency between existing condition and authorised state.

Permits and documentation

Choose the correct route (CILA, SCIA or permit) based on the scope and the building context.

Prepare a complete technical report to reduce requests for clarifications and delays.

Schedule and cost control

Set up a bill of quantities and specifications that describe works, materials and tolerances in measurable terms.

Track decisions on site: inspections, progress records and structured change management.

Technical details that matter

Focus on critical junctions (waterproofing, thermal bridges, services) because most post-handover issues start there.

Design for durability and maintenance: the best-looking solution is not useful if it does not last.

Contact Studio 4e if:
  • You are planning a renovation and want decisions backed by drawings and documents.
  • You have doubts about compliance and cadastre alignment.
  • You want one technical point of contact to coordinate the process.
  • You need site supervision with clear records.
Common mistakes to avoid
  • Mixing up cadastre updates and building permits (they are different).
  • Ignoring waterproofing, slopes, ventilation and other “small” details.
  • Applying standard solutions without reading the building context.
  • No clear responsibilities between client, contractor and designers.

If you want a clear starting point for a project in Sicily,Studio 4ecan review your context and outline the right technical steps.

Start hereWhatsApp +39 3299736697