Moisture and salt air: diagnosing damp issues near the coast – for coastal villas

Before you start, align documents, scope and priorities. That alone prevents most late changes and cost overruns. In Sicily, coastal exposure and mixed building stock make early checks even more important.

Start hereWhatsApp

Where to start

Commission an accurate measured survey and clear drawings: without reliable measures, design is guesswork.

Collect the key documents (permits, drawings, cadastre) and check consistency between existing condition and authorised state.

Technical details that matter

Verify material compatibility with substrates, especially near the coast where salt air accelerates decay.

Focus on critical junctions (waterproofing, thermal bridges, services) because most post-handover issues start there.

Schedule and cost control

Track decisions on site: inspections, progress records and structured change management.

Set up a bill of quantities and specifications that describe works, materials and tolerances in measurable terms.

Permits and documentation

Check constraints and approvals (heritage, landscape, condominium) before appointing contractors.

Prepare a complete technical report to reduce requests for clarifications and delays.

Contact Studio 4e if:
  • You are planning a renovation and want decisions backed by drawings and documents.
  • You have doubts about compliance and cadastre alignment.
  • You want one technical point of contact to coordinate the process.
  • You need site supervision with clear records.
Common mistakes to avoid
  • Starting without a measured survey and without verifying the authorised state.
  • Accepting vague quotations (generic items, undefined materials).
  • Discovering constraints or approvals after works begin.
  • Managing changes informally, without updated quantities and records.

If you want a clear starting point for a project in Sicily,Studio 4ecan review your context and outline the right technical steps.