Building amnesty: what can realistically be regularised – to protect your budget

Many renovations get stuck on details that look minor: an incorrect permit path, outdated drawings or a hidden constraint. In Sicily, coastal exposure and mixed building stock make early checks even more important.

Start hereWhatsApp

Permits and documentation

Prepare a complete technical report to reduce requests for clarifications and delays.

Choose the correct route (CILA, SCIA or permit) based on the scope and the building context.

Where to start

Collect the key documents (permits, drawings, cadastre) and check consistency between existing condition and authorised state.

Commission an accurate measured survey and clear drawings: without reliable measures, design is guesswork.

Schedule and cost control

Track decisions on site: inspections, progress records and structured change management.

Build a realistic programme and the right sequence of trades.

Technical details that matter

Design for durability and maintenance: the best-looking solution is not useful if it does not last.

Verify material compatibility with substrates, especially near the coast where salt air accelerates decay.

Contact Studio 4e if:
  • You need a quick technical check before buying or signing.
  • You must confirm the right permit path and missing documents.
  • You want measurable specs to compare quotes properly.
  • You started works and need to regain control of scope and changes.
Common mistakes to avoid
  • Starting without a measured survey and without verifying the authorised state.
  • Accepting vague quotations (generic items, undefined materials).
  • Discovering constraints or approvals after works begin.
  • Managing changes informally, without updated quantities and records.

If you want a clear starting point for a project in Sicily,Studio 4ecan review your context and outline the right technical steps.