Bill of quantities and specs: how to keep costs under control – to protect your budget

Before you start, align documents, scope and priorities. That alone prevents most late changes and cost overruns. In Sicily, coastal exposure and mixed building stock make early checks even more important.

Start hereWhatsApp

Schedule and cost control

Build a realistic programme and the right sequence of trades.

Track decisions on site: inspections, progress records and structured change management.

Permits and documentation

Check constraints and approvals (heritage, landscape, condominium) before appointing contractors.

Choose the correct route (CILA, SCIA or permit) based on the scope and the building context.

Technical details that matter

Verify material compatibility with substrates, especially near the coast where salt air accelerates decay.

Design for durability and maintenance: the best-looking solution is not useful if it does not last.

Contact Studio 4e if:
  • You are planning a renovation and want decisions backed by drawings and documents.
  • You have doubts about compliance and cadastre alignment.
  • You want one technical point of contact to coordinate the process.
  • You need site supervision with clear records.
Common mistakes to avoid
  • Starting without a measured survey and without verifying the authorised state.
  • Accepting vague quotations (generic items, undefined materials).
  • Discovering constraints or approvals after works begin.
  • Managing changes informally, without updated quantities and records.