Bill of quantities and specs: how to keep costs under control – for 1970s apartments

Before you start, align documents, scope and priorities. That alone prevents most late changes and cost overruns. In Sicily, coastal exposure and mixed building stock make early checks even more important.

Start hereWhatsApp

Technical details that matter

Design for durability and maintenance: the best-looking solution is not useful if it does not last.

Verify material compatibility with substrates, especially near the coast where salt air accelerates decay.

Schedule and cost control

Build a realistic programme and the right sequence of trades.

Set up a bill of quantities and specifications that describe works, materials and tolerances in measurable terms.

Permits and documentation

Prepare a complete technical report to reduce requests for clarifications and delays.

Choose the correct route (CILA, SCIA or permit) based on the scope and the building context.

Where to start

Commission an accurate measured survey and clear drawings: without reliable measures, design is guesswork.

Define priorities and constraints: what is mandatory, what is desirable and what can wait.

Contact Studio 4e if:
  • You need a quick technical check before buying or signing.
  • You must confirm the right permit path and missing documents.
  • You want measurable specs to compare quotes properly.
  • You started works and need to regain control of scope and changes.
Common mistakes to avoid
  • Mixing up cadastre updates and building permits (they are different).
  • Ignoring waterproofing, slopes, ventilation and other “small” details.
  • Applying standard solutions without reading the building context.
  • No clear responsibilities between client, contractor and designers.

If you want a clear starting point for a project in Sicily,Studio 4ecan review your context and outline the right technical steps.