As-built verification: how to avoid surprises at closing – without delaying the schedule

Many renovations get stuck on details that look minor: an incorrect permit path, outdated drawings or a hidden constraint. In Sicily, coastal exposure and mixed building stock make early checks even more important.

Start hereWhatsApp

Schedule and cost control

Set up a bill of quantities and specifications that describe works, materials and tolerances in measurable terms.

Build a realistic programme and the right sequence of trades.

Permits and documentation

Choose the correct route (CILA, SCIA or permit) based on the scope and the building context.

Prepare a complete technical report to reduce requests for clarifications and delays.

Where to start

Define priorities and constraints: what is mandatory, what is desirable and what can wait.

Commission an accurate measured survey and clear drawings: without reliable measures, design is guesswork.

Technical details that matter

Focus on critical junctions (waterproofing, thermal bridges, services) because most post-handover issues start there.

Design for durability and maintenance: the best-looking solution is not useful if it does not last.

Contact Studio 4e if:
  • You need a quick technical check before buying or signing.
  • You must confirm the right permit path and missing documents.
  • You want measurable specs to compare quotes properly.
  • You started works and need to regain control of scope and changes.
Common mistakes to avoid
  • Starting without a measured survey and without verifying the authorised state.
  • Accepting vague quotations (generic items, undefined materials).
  • Discovering constraints or approvals after works begin.
  • Managing changes informally, without updated quantities and records.

If you want a clear starting point for a project in Sicily,Studio 4ecan review your context and outline the right technical steps.