As-built verification: how to avoid surprises at closing – to protect your budget

Before you start, align documents, scope and priorities. That alone prevents most late changes and cost overruns. In Sicily, coastal exposure and mixed building stock make early checks even more important.

Start hereWhatsApp

Schedule and cost control

Set up a bill of quantities and specifications that describe works, materials and tolerances in measurable terms.

Build a realistic programme and the right sequence of trades.

Permits and documentation

Choose the correct route (CILA, SCIA or permit) based on the scope and the building context.

Prepare a complete technical report to reduce requests for clarifications and delays.

Technical details that matter

Design for durability and maintenance: the best-looking solution is not useful if it does not last.

Verify material compatibility with substrates, especially near the coast where salt air accelerates decay.

Where to start

Commission an accurate measured survey and clear drawings: without reliable measures, design is guesswork.

Collect the key documents (permits, drawings, cadastre) and check consistency between existing condition and authorised state.

Contact Studio 4e if:
  • You need a quick technical check before buying or signing.
  • You must confirm the right permit path and missing documents.
  • You want measurable specs to compare quotes properly.
  • You started works and need to regain control of scope and changes.
Common mistakes to avoid
  • Starting without a measured survey and without verifying the authorised state.
  • Accepting vague quotations (generic items, undefined materials).
  • Discovering constraints or approvals after works begin.
  • Managing changes informally, without updated quantities and records.

If you want a clear starting point for a project in Sicily,Studio 4ecan review your context and outline the right technical steps.