As-built verification: how to avoid surprises at closing – to avoid disputes with contractors

If the project starts without solid technical ground, money goes into corrections instead of outcomes. Here is what to check early. In Sicily, coastal exposure and mixed building stock make early checks even more important.

Start hereWhatsApp

Schedule and cost control

Track decisions on site: inspections, progress records and structured change management.

Build a realistic programme and the right sequence of trades.

Where to start

Collect the key documents (permits, drawings, cadastre) and check consistency between existing condition and authorised state.

Commission an accurate measured survey and clear drawings: without reliable measures, design is guesswork.

Permits and documentation

Check constraints and approvals (heritage, landscape, condominium) before appointing contractors.

Prepare a complete technical report to reduce requests for clarifications and delays.

Technical details that matter

Focus on critical junctions (waterproofing, thermal bridges, services) because most post-handover issues start there.

Verify material compatibility with substrates, especially near the coast where salt air accelerates decay.

Contact Studio 4e if:
  • You need a quick technical check before buying or signing.
  • You must confirm the right permit path and missing documents.
  • You want measurable specs to compare quotes properly.
  • You started works and need to regain control of scope and changes.
Common mistakes to avoid
  • Starting without a measured survey and without verifying the authorised state.
  • Accepting vague quotations (generic items, undefined materials).
  • Discovering constraints or approvals after works begin.
  • Managing changes informally, without updated quantities and records.

If you want a clear starting point for a project in Sicily,Studio 4ecan review your context and outline the right technical steps.