As-built verification: how to avoid surprises at closing – for coastal villas

Early decisions define schedule, quality and peace of mind during works. Clarify them before committing. In Sicily, coastal exposure and mixed building stock make early checks even more important.

Start hereWhatsApp

Schedule and cost control

Build a realistic programme and the right sequence of trades.

Track decisions on site: inspections, progress records and structured change management.

Where to start

Define priorities and constraints: what is mandatory, what is desirable and what can wait.

Commission an accurate measured survey and clear drawings: without reliable measures, design is guesswork.

Technical details that matter

Design for durability and maintenance: the best-looking solution is not useful if it does not last.

Focus on critical junctions (waterproofing, thermal bridges, services) because most post-handover issues start there.

Contact Studio 4e if:
  • You are planning a renovation and want decisions backed by drawings and documents.
  • You have doubts about compliance and cadastre alignment.
  • You want one technical point of contact to coordinate the process.
  • You need site supervision with clear records.
Common mistakes to avoid
  • Mixing up cadastre updates and building permits (they are different).
  • Ignoring waterproofing, slopes, ventilation and other “small” details.
  • Applying standard solutions without reading the building context.
  • No clear responsibilities between client, contractor and designers.

If you want a clear starting point for a project in Sicily,Studio 4ecan review your context and outline the right technical steps.